Complete Winter Furnace Upgrade

A rapid, code-compliant extraction and replacement of a failing boiler with a state-of-the-art 96% AFUE two-stage gas furnace.

A rapid, code-compliant extraction and replacement of a failing boiler with a state-of-the-art 96% AFUE two-stage gas furnace.

Location

Downtown Heritage Brownstone

Project Duration

1 Day

Project Objective

Winter Heating

Approaching the Winter Freeze

Dealing with a heavily rusted, failing boiler system from the early 2000s, this client needed a highly reliable heating solution before the harsh winter weather set in. The old system was not only burning excess fuel and driving up utility costs, but it also presented potential safety risks due to deteriorating legacy venting and outdated gas lines.

Precision Installation

Understanding the urgency of the request, our dispatch team scheduled a rapid, one-day extraction and replacement. We stripped out the hazardous equipment and redesigned the utility room layout for better service accessibility.

Our technical execution included:

  • High-Efficiency Heating: Installed 96% two-stage gas furnace.

  • Safety Compliance: Custom-routed new PVC flue ventilation.

  • Air Quality: Integrated heavy-duty media cabinet.

Safety and Efficiency Achieved

The client was left with a pristine, highly organized utility space and a safely heated home. The new two-stage furnace provides a gentle, consistent heat that eliminates the cold spots previously experienced on the second floor, all while operating well within modern safety and environmental standards.

Service Provided

Removed failing boiler

Installed gas furnace

Upgraded PVC venting

Added media filter

AfterBefore

[ MORE PROJECTS ]

Explore similar work.

Browse our portfolio to see more examples of our high-efficiency installations, retrofits, and commercial upgrades.

Browse our portfolio to see more examples of our high-efficiency installations, retrofits, and commercial upgrades.

AfterBefore

High-Efficiency AC System Retrofit

A complete system overhaul featuring an 18-SEER variable-speed condenser and smart zoning for whisper-quiet, high-efficiency climate control.

Services Provided:

Removed old hardware

Installed quiet condenser

Sealed exposed ducts

AfterBefore

Clinical-Grade Air Purification Setup

Engineering a clinical-grade indoor environment by integrating bypass HEPA filtration, UV-C scrubbers, and active dehumidification.

Services Provided:

Assessed air quality

Installed HEPA filtration

Added UV-C scrubbers

Ready to master your indoor climate?

Ready to master your indoor climate?

Request a free estimate or book our 24/7 emergency service today.

Request a free estimate or book our 24/7 emergency service today.

Contact Us Directly

(012) 225 38979

support@tempra.com

7700 Climate Boulevard, Floor 4, Seattle, WA 98109

Contact Info

7700 Climate Boulevard, Floor 4, Seattle, WA 98109

7700 Climate Boulevard, Floor 4, Seattle, WA 98109

(012) 225 38979

support@tempra.com

© 2026 Tempra. All Rights Reserved.

Get for FREE

Get for FREE

Create a free website with Framer, the website builder loved by startups, designers and agencies.